EPUFLOOREPUISORAIL

Epufloor supplies prefabricated slabs for a new investment project in Wrocław.

31. Juli 20251 Min. Lesezeit
Epufloor supplies prefabricated slabs for a new investment project in Wrocław.
A new tramway crossing has been completed at the intersection of Oławska and Podwale Streets in Wrocław, marking another step forward in the modernization of the city’s transport infrastructure. The project was delivered by GM Roads using large-format EPUSLAB prefabricated slabs supplied by EPUISORAIL.

The applied technology enabled rapid installation of the entire system - including two tram tracks and a trackbed - while ensuring excellent structural stability and an even load distribution. The prefabricated slabs, each measuring 6 × 4 × 0,35 m and 7,7 × 3,2 × 0,4 m and weighing over 20 tons, were precisely bonded to the foundation with self-leveling cement grout, guaranteeing long-term durability and performance.

An additional feature of the investment is integrated linear lighting installed within the prefabricated slabs along the pedestrian and bicycle crossings. Connected to the traffic light system, the lighting enhances visibility and safety for all users of the intersection.

We invite you to watch a video from the project implementation.

The successful completion of the project was made possible through the cooperation of EPUISORAIL, GM Roads, and the tram infrastructure operator MPK Wrocław.

Haben Sie ein Projekt? Sprechen wir darüber.

Unsere Experten helfen Ihnen, die beste Lösung für Ihre Investition zu wählen.

Kontaktieren Sie uns – wir beraten Sie und schlagen eine ideale Lösung für Ihr Projekt vor.

Kontaktieren Sie uns
Kontakt