Epufloor supplies prefabricated slabs for a new investment project in Wrocław.

The applied technology enabled rapid installation of the entire system - including two tram tracks and a trackbed - while ensuring excellent structural stability and an even load distribution. The prefabricated slabs, each measuring 6 × 4 × 0,35 m and 7,7 × 3,2 × 0,4 m and weighing over 20 tons, were precisely bonded to the foundation with self-leveling cement grout, guaranteeing long-term durability and performance.
An additional feature of the investment is integrated linear lighting installed within the prefabricated slabs along the pedestrian and bicycle crossings. Connected to the traffic light system, the lighting enhances visibility and safety for all users of the intersection.
We invite you to watch a video from the project implementation.
The successful completion of the project was made possible through the cooperation of EPUISORAIL, GM Roads, and the tram infrastructure operator MPK Wrocław.
Das könnte Sie auch interessieren

Architecture and interior design in the era of conscious silence
The year 2026 in architecture and interior design emphasizes calm, harmony, and conscious material choices. Spaces designed with people in mind combine functionality with timeless beauty, offering comfort and balance in everyday life.

Epufloor to supply a polyurethane surface for the new sports field at the XXVII High School in Warsaw.

