Railway Crossing Renovation in Łódź Using EPUISORAIL Technology.

The double-track crossing, measuring over 70 meters in length, was renovated using modern prefabricated track slabs that allow for faster installation and more even track alignment. Special vibration-damping mats were installed beneath the slabs to reduce the transmission of vibrations generated by passing trams—both to the structure itself and to the surrounding area. This solution is particularly important in urban environments, where traffic intensity can be high.

In total, more than 400 m² of vibration-damping mats and over 5 tonnes of resin were used to complete the crossing, making the new installation not only more durable but also quieter and more comfortable for everyday use.
Vous pourriez aussi aimer

Architecture and interior design in the era of conscious silence
The year 2026 in architecture and interior design emphasizes calm, harmony, and conscious material choices. Spaces designed with people in mind combine functionality with timeless beauty, offering comfort and balance in everyday life.

Epufloor to supply a polyurethane surface for the new sports field at the XXVII High School in Warsaw.

